5x 175m Geothermal Boreholes Installed near Welwyn Garden City

With challenging chalk conditions, Future Drilling applied an air drilling method to achieve 175m depths in less than 2 hours per borehole.

Location

Welwyn Garden City

Method

Air Drilling

Geology

Chalk

Equipment Used

  • GTD GT35 Drilling Rig
  • 980CFM Compressor
  • MultiOne Loader