5x 175m Geothermal Boreholes Installed near Welwyn Garden City
With challenging chalk conditions, Future Drilling applied an air drilling method to achieve 175m depths in less than 2 hours per borehole.
![](https://www.future-drilling.co.uk/app/uploads/2023/08/1691680957-3d911712bec392ab4b0a/e2e988e0baa2dea7ec9f-scaled.jpg)
With challenging chalk conditions, Future Drilling applied an air drilling method to achieve 175m depths in less than 2 hours per borehole.
Future Drilling Services successfully completed the installation of 2x 175m geothermal boreholes on a domestic property near Colchester
Read articleFuture Drilling Services successfully completed the installation of 2x geothermal boreholes on a 2 domestic properties near Tottenham, North London
Read articleFuture Drilling Services successfully completed the installation of 6x 193m geothermal boreholes on a domestic property near Reading
Read article