5x 175m Geothermal Boreholes Installed near Welwyn Garden City

With challenging chalk conditions, Future Drilling applied an air drilling method to achieve 175m depths in less than 2 hours per borehole.

Location

Welwyn Garden City

Method

Air Drilling

Geology

Chalk

Equipment Used

  • GTD GT35 Drilling Rig
  • 980CFM Compressor
  • MultiOne Loader

Related work

1 min read

6x 193m Geothermal Boreholes near Reading

Future Drilling Services successfully completed the installation of 6x 193m geothermal boreholes on a domestic property near Reading

Read article
1 min read

7x 200m Geothermal Boreholes Installed near the Emirates Stadium

Future Drilling Services successfully completed the installation of 7x 200m geothermal boreholes on a commercial housing property in North London

Read article
1 min read

2x 200m Geothermal Boreholes Installed in North London

Future Drilling Services successfully completed the installation of 2x 200m geothermal boreholes on a domestic property in North London

Read article